7-Eleven has announced plans for three new convenience stores and fuel stations across the Rio Grande Valley, marking a $3.6 million expansion that spans Mission, Donna and Mercedes.
The latest additions are two newly filed projects in Mission and Donna, according to records filed with the Texas Department of Licensing and Regulation.
They follow a previously reported 7-Eleven development planned in Mercedes, bringing the chain’s announced Valley pipeline to three new locations totaling more than 14,300 square feet of retail space.
The Mission project calls for construction of a 4,816-square-foot convenience store with fueling services at the intersection of North Conway Avenue and West Mile 2 Road. The development carries an estimated cost of $1.2 million, with construction scheduled to begin Jan. 17, 2027, and conclude by Oct. 4, 2027.
In Donna, 7-Eleven plans to build a 4,746-square-foot convenience store with fueling services at North Val Verde Road and Minnesota Road. The project is also valued at $1.2 million and is scheduled to begin construction Dec. 10, with completion expected Oct. 30, 2027.
The two new stores will be built on private land for private use and are currently listed as Project Registered.
The Mission location is owned by Yucca Street Investments LLC, while the Donna property is owned by 888 Acquisitions LLC. Both projects list Dave Johnson as the tenant and The Dimension Group, a Dallas-based architecture and design firm, as the project designer.
The latest filings build on a previously reported $1.2 million project in Mercedes, where 7-Eleven plans to construct a 4,746-square-foot convenience store and fuel station at 1990 W. Expressway 83. Construction on that location is scheduled to begin in January 2027.
Most Read
- SpaceX is giving Brownsville $220M for water projects. In exchange, the city gave up zoning control of 444 acres near Starbase
- What you need to know about Texas A&M’s newest manufacturing hub near the Port of Brownsville
- Port of Brownsville could soon host Nodule City, a first-of-its-kind commercial deep-sea mining hub
- Fluidstack breaks ground on $4 billion Cameron County AI data center
- Cameron County is negotiating a $20M Fluidstack data center donation after Harlingen waffles on the same offer
Get the latest business news delivered to your inbox every morning for free.
Try 30 Days Free!
Get full access to award-winning journalism covering business, real estate, health care, economic trends, and the people shaping the Rio Grande Valley.
30 Days Free!
$9.95/month
Limited time offer
Subscription renews after your 30 day free trial at $9.95/mo.
Included Benefits
- Unlimited access to all articles
- Daily business news and analysis
- Subscriber-only content and features
Stories That Matter
- Mexico car sales are growing, but its factories are making fewer vehicles
- Edinburg’s Texas Cook’Em generated nearly $7 for every $1 invested
- Momole gains ground in McAllen as Reynosa-born brand plots U.S. expansion
- Mission’s first Small Business Expo puts $25K on the line for local entrepreneurs
- Harlingen earns state tourism certification aimed at boosting local economic development
- Reynosa’s newest technical high school focuses on AI, semiconductors and bionics
- McCoy’s gives $10K, tools to launch Mid-Valley construction academy
- UT Health RGV performs new digestive procedure for first time in the Valley
- TSTC bets on advanced manufacturing to meet RGV’s industrial boom
- Pharr’s cross-border business push earns international recognition