Houston-based energy company NextDecade Corp. is hosting a public meeting this month to discuss its expansion plans for the Rio Grande LNG project in Brownsville, which could cost several billion dollars.
Rio Grande LNG expects to spend $30 billion for trains one through five along the Brownsville Shipping Channel.
NextDecade’s meeting is slated for Feb. 17 from 5 p.m. to 7 p.m. at the Port Isabel Event and Cultural Center, located at 309 Railroad St.
The meeting is required by the Federal Energy Regulatory Commission’s environmental review process to inform landowners, stakeholders, and elected officials about the company’s plans.
A liquefaction train is a processing facility that takes natural gas from a pipeline and both compresses and supercools it. The final product, liquefied natural gas, is a supercooled product often exported overseas as an alternative energy source to nations without domestic energy extraction industries, such as many European and Asian countries.

NextDecade, a publicly traded company, already has several long-term contracts to export various volumes of LNG to companies such as ConocoPhillips, JERA, and EQT Corporation.
As a result of those contracts, four liquefaction trains are under construction, and the company approved a final investment decision for a fifth train in late 2025. The first train should be built by 2027.
Now, Rio Grande LNG plans to add a sixth liquefaction train and marine jetty inside a massive export terminal along the Brownsville Ship Channel.
The export terminal has space for 10 liquefaction trains on a nearly 1,000-acre site, with a capacity of 60 million tonnes of LNG per year.
Trains one through five are under construction, and the sixth train is in the permitting process. Trains seven and eight are in planning and development.
Next Carbon Solutions is also collaborating with Rio Grande LNG to develop a potential carbon capture and storage project at the same location, but there is no timeline for construction, according to U.S. Securities and Exchange Commission filings.

Most Read
- New $1.6M food hall aims to transform downtown Edinburg with dining, retail and events
- Vice President J.D. Vance cancels South Texas visit ahead of Port of Brownsville event
- Economic progress at the Port of Brownsville draws vice president’s visit
- Crunch Fitness plans a new 50,000-square-foot Harlingen location
- U.S. Energy Secretary says visas ‘won’t be an issue’ for Port of Brownsville oil refinery
Get the latest business news delivered to your inbox every morning for free.
Try 30 Days Free!
Get full access to award-winning journalism covering business, real estate, health care, economic trends, and the people shaping the Rio Grande Valley.
30 Days Free!
$9.95/month
Limited time offer
Subscription renews after your 30 day free trial at $9.95/mo.
Included Benefits
- Unlimited access to all articles
- Daily business news and analysis
- Subscriber-only content and features
Stories That Matter
- SpaceX is giving Brownsville $220M for water projects. In exchange, the city gave up zoning control of 444 acres near Starbase
- Nearly $164M in water conservation investments planned for Rio Grande Valley
- UT Health RGV performs new digestive procedure for first time in the Valley
- Nearly 4,000 Cameron County homes could lose state-backed windstorm coverage
- Brownsville advances as finalist for potential professional soccer team
- Competition for Rio Grande Valley workers is heating up
- Social Fest launches RGV Creator of the Year award
- Mexican tech company chooses McAllen as launchpad for U.S. expansion
- Mission’s first Small Business Expo puts $25K on the line for local entrepreneurs
- Construction workers make up nearly 1 in 3 unemployment claims in three RGV counties